Which result does each utility actually describe?
Autodesk's 19 August 2026 guidance describes PURGE as removing unused items such as block definitions and layers, AUDIT as evaluating drawing integrity and correcting some errors, and RECOVER as repairing and opening a damaged file. A smaller file after cleanup is not an audit result.
DWG Conversion is independent and is not affiliated with Autodesk. This article provides a review record, not a command sequence to apply blindly to every drawing. Use approved copies and the procedures appropriate to the installed software and file condition.
Sources: Autodesk: Optimizing drawing files with Purge, Audit and Recover, 19 August 2026
What evidence belongs in the migration release record?
Preserve the incoming drawing and identify the exact working derivative. Record the actual operation and reported result so cleanup, repairs and content changes do not disappear under a single label such as fixed.
| Field | Record | Review |
|---|---|---|
| Baseline | Original file, dependencies and revision | Retain a recoverable source |
| Cleanup | Operation, scope and observed result | A size change is not content approval |
| Database check | Utility, log and any reported errors | Preserve unresolved outcomes |
| Dependencies | Actual referenced files and paths | Confirm the intended set opens |
| Drawing review | Geometry, text, attributes and plot comparison | Technical meaning still needs checking |
| Release | Exact final file and reviewer disposition | Keep earlier derivatives identifiable |
How can a clean-looking result remain incomplete?
Illustrative example. A fictional migrated electrical drawing contains an unused layer named TEMP-OLD. Cleanup removes that unused definition and the saved file becomes smaller. The review record contains no database-check result and no comparison of the actual circuit labels with the approved source.
The coordinator records unused-item cleanup observed, database check missing, and technical comparison pending. They do not write that the drawing passed AUDIT or that all circuit information is correct. The example uses a synthetic layer name and is not a report about a real customer file.
What should happen if a repair changes the drawing?
Save the changed derivative with an identifiable review history and compare the affected content with the controlled baseline. Reopen references and inspect the actual plotted sheets under the approved QA process. A utility reporting no remaining database errors cannot verify design intent or prove that missing source content was restored.
Ask the drawing owner to resolve absent evidence rather than recreate electrical meaning by guesswork. Engineering sign-off is performed only by the registered engineer on the job. This workflow does not approve a circuit design or prescribe field changes.
Common questions
What else should the bid team know?
Does a smaller DWG prove an audit passed?
No. Record the actual database-check result separately.
Can an audit verify circuit design intent?
No. Technical content requires comparison and responsible engineering review.
Should cleanup overwrite the only original?
Keep the controlled original and review identifiable working derivatives.