What should the working register show?
Illustrative example. Use the actual source file, project CAD standard and receiving document requirements.
| Topic | Evidence or action | Owner |
|---|---|---|
| Sheet | Number and title | Set register |
| Source | File, revision and page | Input record |
| Quality | Vector, raster or mixed | Conversion method |
| Disposition | Converted, redrawn or excluded | Review status |
What does the source support?
ISO 19650-1 supports structured information management. A controlled sheet register is an implementation aid, not a claim about a particular project standard.
What remains open for review?
Conversion does not certify design intent, field accuracy or engineering compliance. The responsible project team must approve the final drawing status.
Common questions
What else should the bid team know?
Does conversion create an approved design?
No. It creates a CAD deliverable from supplied source information for review.
Can missing geometry be guessed?
No. Mark uncertain content and request source confirmation.
Who approves the engineering content?
The responsible project engineer and registered engineer on the job.
Primary sources
- PDF Import in AutoCAD results in low quality dataAutodesk
- About Drawing StandardsAutodesk
- ISO 19650-1:2018, Organization and digitization of information about buildings and civil engineering worksInternational Organization for Standardization