What does the command reference actually describe?
Autodesk's REGEN reference describes regenerating the drawing, recomputing locations and visibility in the current viewport, and reindexing for display and selection performance. Those operations describe the drawing display process, not a comparison with the approved electrical source.
DWG Conversion is independent and is not affiliated with Autodesk. The opened reference is dated 2013 within the 2026 Help portal; check behavior in the actual delivery version. Treat source acceptance as a separate review decision.
Which issue is being closed?
Write a specific observation before recording a command as the solution. A smoother view or a disappearing artifact cannot supply a missing source revision or a geometry comparison.
| Issue class | Check | Closure evidence |
|---|---|---|
| Display | Observed artifact before and after | Same view and observation |
| Dimensions | Approved source and actual geometry | Recorded comparison |
| Connections | Relevant electrical paths and symbols | Qualified review |
| References | Required files and revisions | Reopened delivery package |
| Output | Final plotted sheet | Visible content check |
| Acceptance | Agreed review scope | Authorized disposition |
What can an improved screen view fail to prove?
Illustrative example. A fictional converted switchroom drawing shows an awkward-looking curve. After REGEN it looks smooth, and the conversion log labels the whole sheet checked. No one has compared the curve's location, adjacent equipment or source dimensions.
The reviewer closes only the observed display issue. The geometry and source-comparison checks remain open until completed. This does not mean REGEN moved the equipment or corrected a wrong dimension; it means a visual improvement was being used to support a broader claim than the evidence allows.
What should the handover record say?
Retain the source revision, DWG version, view affected and observed display result. Link separate comparison records for geometry, electrical connections and plotted output. If the symptom returns, preserve that observation rather than describing the command as a permanent repair.
Use the agreed review procedure for corrections. This article does not authorize changes to electrical design or declare drawing databases free from corruption. Engineering sign-off is performed only by the registered engineer on the job.
Common questions
What else should the bid team know?
Does REGEN compare a DWG with its source PDF?
No. A separate source comparison is needed.
Can a display issue be closed while geometry remains unreviewed?
Yes. Record the different review scopes honestly.
Does a smoother curve prove the right dimensions?
No. Check the actual geometry against approved information.