What does the software reference establish?

Autodesk's AutoCAD 2026 managed reference describes ToPolylineWithPrecision as generating an approximation of a spline. It documents an integer precision parameter and warns that unnecessarily high precision can create excessive vertices and reduce display performance.

The SPLINEDIT command reference separately describes its conversion precision setting. Neither a large setting nor a smooth appearance supplies the project's measured acceptance result. DWG Conversion is independent and is not affiliated with Autodesk. Record the actual command or API and version used; their parameter rules are not assumed identical.

Sources: Autodesk: Autodesk AutoCAD 2026: Spline.ToPolylineWithPrecision(int), checked 22 October 2026

Which record separates settings from acceptance?

A software-control value and a length deviation need different fields. Preserve the source spline before changing the working derivative.

Which record separates settings from acceptance?
RecordRequired evidencePurpose
SourceControlled original curveComparison baseline
ConversionActual command or API and versionReproducible method
SettingsPrecision and segment basisWhat was requested?
UnitsDrawing and comparison unitsWhat does a distance mean?
AcceptanceApproved checks and limitsWhat must be demonstrated?
ResultMeasured comparison and reviewerDid the derivative pass?

What is a misleading handover statement?

Illustrative example. A fictional conversion log says precision 80, therefore 0.08 mm tolerance achieved. It contains no measured comparison, no approved tolerance reference and no explanation for the numerical conversion.

The reviewer removes that unsupported conclusion while preserving the original log. The actual setting remains recorded as 80. The team obtains the approved comparison method and records its results rather than inventing a distance unit for an integer control.

What should the reviewer inspect after conversion?

Check the affected electrical geometry and the relevant endpoints, connections and output under the approved QA process. Smooth display and a higher vertex count are not substitutes for those checks. This worksheet does not recommend a universal precision value or prescribe a tolerance for every curve.

Technical acceptance remains with the responsible project reviewer. Engineering sign-off is performed only by the registered engineer on the job.

Common questions

What else should the bid team know?

Does precision 80 mean 0.08 mm?

No such conversion is established by the cited parameter definition.

Does a higher setting automatically prove acceptance?

No. Verify the actual result under the approved comparison process.

Should the original curve be discarded?

No. Retain the controlled baseline and an identifiable derivative.

Primary sources

  1. Autodesk AutoCAD 2026: Spline.ToPolylineWithPrecision(int), checked 22 October 2026Autodesk