As-built drawing updates
Site markups, redlines and test records may conflict. We register the evidence, update the drawing and flag uncertainty rather than invent installed conditions.
Illustrative example
What the reviewed deliverable contains
The rows below are synthetic. They show the structure of the output, not a client project.
| Item | Source | Review status |
|---|---|---|
| DB-01 | Site redline | Circuit label updated |
| Cable C-12 | Test sheet | Route needs confirmation |
| Panel P-03 | Photo | Tag under review |
Deliverables
What you receive
- Revised DWG and PDF
- Change register
- Markup-to-sheet trace
- Open verification list
Inputs
What we need from you
- Current issued drawings
- Dated site markups
- Approved equipment and circuit data
Checked by people
How the work moves from pack to issue
01
Receive
Register field markups and revisions.
02
Update
Apply approved changes to the controlled drawing.
03
Check
Compare changes with the evidence and route gaps back to the project engineer.
Scope boundary
What is not included
- Site surveying
- Inventing missing field conditions
- Engineering sign-off